The Construction involved demolition of existing building, Cartaway debris and dismental equipments. The new 7 Storey building consists of commercial pupose ground floor and 6 floors for three bedroom and two bedroom apartments. Other activities/tasks included were supply and installation of lifts, fire pump and tanks, holding tank, external lighting and cabling, main power line , water line works, interlock paving and car park works and associated MEP works.
Client: Yahya Construction LLC / YMN
Consultant: Al Saqf Engineering
Main Contractor: Yahya Construction LLC
Period: May 2013 - November 2015
Completed Interior design package for Tamrah Shop involving Specailist Gypsum, Marble, Glass, Tim...
Read MoreThe project involved the fixing of decorative marble flooring and wall cladding to the main VIP a...
Read MoreYahya Construction LLC the Nominated SubContract for Supply and fix the Joinery and Gypsum Works....
Read MoreThe Construction involved demolition of existing building, Cartaway debris and dismental equipmen...
Read MoreThe major works involved were fabrication and fixing of decorative Joinery Teak wood panelli...
Read MoreThe Package includes Fabrication and Fixing of Joinery and doors works. The items are carved Exte...
Read More